Project Details

  • Project Value – £ 16k
  • Duration of Works – 10 Days
  • High-end Reatil strip out back to build base core
  • Team – 5 Men
  • Total Waste Cleared – 38 Tonnes
  • Site Safety – 100%
This central London Hugo Boss store was completely stripped out, ready for a new tenant re-fit.
  • 3D were tasked to strip out and remove all shop fitting fixtures and fittings.
  • A complete strip out of the dry lined walls, MF ceiling and tiled flooring was carried out.
  • All power, alarms and data were removed.
  • A clean slab to slab was handed over.