Saffron Hill – Office Strip Out, London

  • Saffron
  • Saffron D
  • Saffron A
  • Saffron B
  • Saffron C
  • Saffron E

Project Details

  • Project Value – £ 15k
  • Duration of Works – 8 Days
  • Partial soft strip out of two floors
  • Team – 4 Men
  • Specialists – HVAC
  • Total Waste Cleared – 19 Tonnes
  • Site Safety – 100%
This two office floors were partly stripped out by 3D, in preparation for a planned refit by Thinking Space.

    3D were tasked to strip out and remove all two kitchens, all WC blocks with extraction.
    A complete strip out of the dry lined walls, part MF ceilings and carpet tile floor covering.
    The AC system were de-gassed, IT / comms room removed.
    All waste was removed via the passenger lift in our type specific waste cages.
    The passenger lift car was fully protected as was the walkway to the exit point.
    A clean site was handed over.