St James Square Pall Mall

  • IMG

Project Details

  • Project Value – £ 52k
  • Duration of Works – 14 Days
  • Complete Cat”A” strip out, back to base build / core
  • Team – 8 Men
  • Specialists – M&E isolation
  • Total Waste Cleared – 88 Tonnes
  • Site Safety – 100%
A premier site and project managed and stripped out by 3D.

  • The St James Square Pall Mall was a complete seven floor soft strip out project.
  • All floors were cleared, removing from site12mm full height glazed partitioning, ceilings, lighting and all the entire power installation.
  • The AC system situate on the roof and split units on the floor were all degassed and removed / recycled.